chemXplore tracks 20 projects in Turkey, of which 5 are active.
Of the active ones, 5 new construction.
1 active project carries no start-up date yet. The dates themselves, per project, are for subscribers.
The Istanbul hub combines battery testing, repair, refurbishment, training and retail, serving electric mobility and energy storage customers.
Keel laid at Nantong yard on Oct 25, 2026; hull block assembly started in dry dock; FPU rated 25 million scm/day for 2,150 m water depth with 30-year life; built for TPAO.
Revenue reached €5.6bn, EBITDA rose 15.7% and order intake hit €8.9bn, with a €16.4bn backlog at the end of September.
Planned Aliağa complex would total 850,000 t/yr across two 425 kTA swing lines; selection precedes the project's final investment decision and aims to expand domestic polyolefin supply.
Once‑daily oral GLP‑1 cut MACE vs insulin glargine, lowered A1C by 1.6% at 52 weeks and produced mean weight loss of 8.1 kg with durable effects to 104 weeks.
Assessing conversion of Turkish waste-based biogas plants to biomethane for export to the EU via existing gas grids.
Includes license for a world‑scale mixed‑feed ethylene cracker and PDP/FEED for integrated units producing ethylene, propylene, HDPE/LLDPE and polypropylene.
Absheron expansion to unlock up to 5 Tcf of gas; production expected from 2029 at 600 MMcf/d and 47,000 b/d condensate, tied into the Southern Gas Corridor.
Expansion at Mazidagi will convert leach residue into iron and slag using rotary kiln pellets and a 30 MVA DRI smelting furnace to cut waste and recover value.
Key concentrator package for a greenfield polymetallic mine in Yozgat province covering comminution, flotation, dewatering and online analytics.
active / all projects