chemXplore tracks 140 projects in Spain, of which 39 are active.
23 new construction, 10 expansion, and 3 revamp / retrofit.
8 of the active projects carry no start-up date yet.
Owners and developers: Repsol (6), Moeve, S.A. (5), Ercros (4), BASF SE (3), Enagás (3), Exolum (2)
Investors: European Investment Bank (3), Enagás Renovable (2), Ercros (2), Institut Català de Finances (2), Kutxabank (2), Volkswagen (2)
Contractors, licensors, and offtakers are recorded on 18 of these 39 projects For subscribers
Targeting: Hydrogen (11), Methanol (4), Sustainable Aviation Fuel (4), Carbon dioxide (2), HVO (2), Oxygen (2)
FDA clears once‑weekly basal insulin that reduces injection frequency vs daily therapy; Phase 3 QWINT trials in >3,400 adults showed non‑inferior A1C vs glargine and degludec.
€1bn Europe-wide auction for industrial process-heat decarbonisation; bidding opens early Dec 2026. Supports electrification, renewable heat and SMRs with a fixed premium per tCO2.
First phase delivers 300 MW (option +105 MW), ~45,000 tH2/yr, >€1bn phase investment, €304m public support and an expected >8,000 jobs across the value chain.
SAF reached 1.1 Mt (2.8% share), a near sixfold rise from 2024; supplied at 121 airports, 84% produced in the EU, and 18 Member States host production projects.
First phase includes a 300 MW electrolyser (>€1bn capex), ~45,000 t H2/yr and ~250,000 t CO2 avoided; received €304m public funding and reached FID.
Stake in Grandpuits recycling plant transferred to full ownership; plant uses TAC™ technology under licence and recycles 15,000 t/yr.
Joint public‑private platform to develop large‑scale projects using biomethane, renewable hydrogen and second‑generation biofuels to cut CO2 in steel production.
Total outflows 3.7 million cubic metres; gasoline +6.7%, diesel -3.5%; motor fuels 2.5 million m³ (-0.1%); kerosene 868,700 m³ (+4.8%).
Selected to supply 60 heat exchangers for electrolyzer and balance-of-plant cooling at La Rábida; initial 300 MW electrolysis, expandable by 105 MW, targeting 45,000 t/yr green hydrogen.
Hybrid furnace to cut CO₂ from flat glass production; construction starts Jan 2027, production H2 2027; co-funded by the EU ETS Innovation Fund.