chemXplore tracks 38 projects in Brazil, of which 25 are active.
15 new construction, 7 expansion, and 3 revamp / retrofit.
9 of the active projects carry no start-up date yet.
Owners and developers: Petróleo Brasileiro S.A. (17), Braskem (2), IBV Brasil Petróleo Limitada (2), ARLANXEO (1), Acelen Renewables (1), China National Offshore Oil Corporation (1)
Investors: Petróleo Brasileiro S.A. (8), China National Offshore Oil Corporation (2), IBV Brasil Petróleo Limitada (2), ONGC Campos Ltda (2), Pré-Sal Petróleo S.A. (2), Asian Infrastructure Investment Bank (1)
Contractors, licensors, and offtakers are recorded on 14 of these 25 projects For subscribers
Targeting: Natural gas (10), Crude oil (9), Carbon dioxide (4), Ammonia (1), Diesel, fuels (1), HVO (1)
Reached R$700.08bn after an ultra‑deep‑water discovery off Amapá; shares jumped and production rose to nearly 3 million b/d.
New oil-bearing interval in Morpho well (block FZA-M-59) at 2,886 m water depth; identified by electrical logs, rock indications and fluid samples; lab analyses ongoing.
Magda Chambriard will brief media on a new oil discovery in deep waters off Amapá; onsite attendance and Teams streaming available; accreditation required by 13h.
Scheduled shutdown from Oct 5 to the second half of November to modernize units, improve safety and energy efficiency; peak workforce about 6,000.
Hybrid press conference detailed a new deep-water oil discovery on the Brazilian equatorial margin; top executives participated and a video was released.
Post‑hoc ATTAIN‑1 modelling: oral orforglipron cut predicted 10‑year type 2 diabetes risk up to 57% and cardiovascular risk up to 18% versus placebo at 72 weeks.
Once‑daily oral GLP‑1 cut MACE vs insulin glargine, lowered A1C by 1.6% at 52 weeks and produced mean weight loss of 8.1 kg with durable effects to 104 weeks.
Preventive logistics for LPG and oil during the Amazon low-water season: early resource mobilisation, vessel positioning and Navy monitoring, plus floating storage in Coari.
225,000 bbl/d oil capacity and 12 million m³/d gas processing; first of a six-platform series; P-80 and P-82 due to start production in 2027.
Secures 0.8 mtpa of LNG for 22 years to reduce spot-market exposure and strengthen gas-portfolio risk management.