chemXplore tracks 172 projects in The Netherlands, of which 57 are active.
46 new construction, 6 expansion, 3 revamp / retrofit, and 2 conversion / repurposing.
10 of the active projects carry no start-up date yet.
Owners and developers: Gasunie (9), Hynetwork (5), Shell (4), EBN (3), Port of Rotterdam (3), RWE AG (3)
Investors: Invest-NL N.V. (6), Gasunie (5), NV NOM (4), Netherlands Enterprise Agency (3), EBN (2), Infinity Recycling (2)
Contractors, licensors, and offtakers are recorded on 38 of these 57 projects For subscribers
Targeting: Hydrogen (16), Pyrolysis oil (7), Carbon dioxide (6), Plastic waste (5), Sustainable Aviation Fuel (4), Methanol (3)
Summit endorses ARRRA cluster priorities: level playing field, cross-border energy networks and fast-track planning to accelerate hydrogen, CCS, circular economy and innovation.
MoU to assess local renewable hydrogen supply for a planned Delfzijl biomethanol plant, targeting roughly 12,000 tonnes H2 per year to boost biomethanol yields.
Single-source framework for engineering, installation, asset performance, access and insulation at Delfzijl chemical park; three-year term with two-year extension option.
Adhesive Technologies expands into specialty coatings after closing the Stahl deal; Stahl adds leather, performance and packaging coatings, €725m sales and ~1,800 employees.
Independent startup to commercialize plant‑based high‑performance polyesters (PISOX, PISA, PEIT/PEIF) using common monomers and existing industrial assets.
Deal cleared by the German Federal Cartel Office; target is a coagulant producer with two German plants, EUR 40m revenue in 2025 and about 60 employees.
New 180,000 m³ tank adds 4 bcm/y regasification, raising terminal capacity to 20 bcm/y and strengthening supply security for the Netherlands and NW Europe.
Regulators and stakeholders agreed 10 priority actions to close research, trial and data gaps and improve inclusion of women across the medicines lifecycle, with a roadmap due by end-2026.
H1: revenues €4.7m, EBITDA -€18.8m, cash €23.9m; first FDCA batch produced; planned equity raise ≥€55m and proposed €20m facility; Worley contractual close‑out finalised.
Calls for phased Ghent–Terneuzen Canal upgrades to exploit the NeoPanamax-capable New Lock, cut waits, deepen sections and boost inland-waterway freight on TEN-T corridors.
active / all projects