Chemical park of Huelva

Port of HuelvaSpainAndalucía

projects tracked
10
active
6
companies present
16

Projects at Chemical park of Huelva

chemXplore tracks 10 projects at Chemical park of Huelva, of which 6 are active.

  1. 1 project Announced / Concept
  2. 2 projects FEED / Pre-FID
  3. none FID / Sanctioned
  4. 3 projects Under Construction
  5. none Commissioning & Start-up

Of the active ones, 5 new construction and 1 revamp / retrofit.

Expected start-up, by year
0 1 2 2026 2027 2028 2029 2030 2031

The dates themselves, per project, are for subscribers.

What moved recently

Latest news on Chemical park of Huelva

2 September 2026
Alfa Laval to supply electrolyzer cooling for Moeve’s Onuba H2 project

Selected to supply 60 heat exchangers for electrolyzer and balance-of-plant cooling at La Rábida; initial 300 MW electrolysis, expandable by 105 MW, targeting 45,000 t/yr green hydrogen.

7 May 2026
ALTTION joins AIQBE as strategic ally

Offers industrial protection services: anti-corrosion, passive fire protection, rope access, turbine maintenance and automation; will share solutions and best practices in technical forums.

12 March 2025
Moeve and Exolum invest €300M in Port of Huelva for energy transition infrastructure

New infrastructure at the Port of Huelva will enhance biofuel operations, improve logistics, and support decarbonization efforts, aligning with regional industrial policies.

23 February 2024
Cepsa and Bio-Oils Start Construction on Southern Europe's Largest 2G Biofuels Plant

The new plant in Huelva will double 2G biofuels capacity to 1 million tons by 2026, creating 2,000 jobs. It will produce SAF and renewable diesel, cutting CO2 emissions by 75% compared to traditional plants.

25 April 2023
Cepsa Awards Técnicas Reunidas Engineering Contract for 2G Biofuels Plant in Huelva

The plant will produce 500,000 tons of renewable diesel and SAF annually, reducing CO2 emissions by up to 90%. The project involves over 180 experts and 500,000 hours of work.

14 April 2023
Cepsa and Bio-Oils to Build Largest 2G Biofuels Plant in Huelva

The new plant will produce 500,000 tons of SAF and renewable diesel annually, create 2,000 jobs, and reduce CO2 emissions by up to 90%, with operations starting in 2026.

8 March 2023
Cepsa to Invest 1 Billion Euros in New Biofuels Plant in Spain

The new plant in Palos de la Frontera will create 1,600 jobs, produce biofuels from organic waste, cut CO2 emissions by 90%, and support the company's 2030 strategy for energy transition and decarbonization.

17 September 2021
Transforming Waste into Biofuel at LIPSA Huelva

The Huelva plant processes up to 500,000 tonnes of waste into biofuel annually, promoting circular economy, reducing GHG emissions, and creating local jobs while continuously innovating in waste pre-treatment.

2 July 2021
AIQBE 2020 Summary

Despite COVID-19, AIQBE added 2,565 jobs in 2020, contributing significantly to Huelva's GDP. Turnover was €6.9B, with 32% of production exported. Investments totaled €219M.

22 June 2021
Alter Enersun Launches New Photovoltaic Plant in Huelva

The new 50 MWp plant in Huelva will generate 100 GWh annually, powering 28,000 homes, reducing CO2 by 94,400 tons, and creating 10 permanent jobs. Construction involved a 2.78M euro investment.

About the park

Total area
1,700 ha
Available area
760 ha

Companies at this park