EC 231-131-3
chemXplore tracks 6 projects producing silver, of which 3 are active.
Of the active ones, 2 new construction and 1 expansion.
Public tours show energy-from-waste operations, lamp recycling, bottom-ash recovery and a landfill viewpoint across themed routes with music and family activities.
Contracts cover study and EPCM work for potential Olympic Dam block cave and Carrapateena underground expansion; both projects are subject to BHP final investment decisions.
Deal uses a 0.25 share exchange valuing Nexa at ~USD 2.03bn equity (USD 3.67bn EV); closing targeted Q1 2027 with a VTO for remaining shares and USD 2.0bn bridge financing.
Key concentrator package for a greenfield polymetallic mine in Yozgat province covering comminution, flotation, dewatering and online analytics.
Government rejected appeals, keeping the Laver concession intact; the deposit could double Sweden’s copper output and boost Europe’s copper self-sufficiency by about 10%.
Adj. EBITDA +33% to €577m and margin 30.2%; revenues €1.9bn; Free Operating Cash Flow €295m; guidance upgraded to slightly above €1bn adj. EBITDA for FY2026.
Majority buy adds pyrometallurgical, hydrometallurgical and electrowinning tech to recover precious and critical metals from e‑waste, batteries, PV panels and mining tailings.
Academic-industry collaboration to develop biosurfactant-based, lower-toxicity chemicals for mining, accelerating market rollout while reducing environmental impact.
€20M+ plus EU grants to fund industrial expansion: 10,000 t/yr solar-panel recycling plant in Spain, scalable automated line, new production director appointed, recycling partnership renewed
Seismic activity eased; limited production restarts in Q2 at ~100 kt/month. Major damage in an ore body delays some mining into 2026. Q1 EBITDA impact -SEK400M; zinc grade slightly down.
plants
A subscription lists every plant we track for silver, with its owners and capacity. What a subscription does →