Boliden Group

Swedenboliden.com

Boliden Group (Boliden) is a Swedish mining and metals company that explores, mines, smelts, and recycles base and precious metals. Its operations span Sweden, Finland, Norway, and Ireland, with major mines including Aitik (copper), Garpenberg (zinc-lead-silver), Kevitsa (nickel-copper), and Tara (zinc). Boliden’s smelters include Rönnskär (copper and precious metals recovery, including e‑scrap) in Sweden, Harjavalta (copper and nickel) and Kokkola (zinc) in Finland, and Odda (zinc) in Norway. The company’s product portfolio includes zinc, copper, nickel, lead, gold, and silver, along with industrial by-products.

Boliden supplies refined metals, concentrates, and intermediate materials to manufacturing and process industries, including chemical producers. Its smelting operations generate sulfuric acid and other by-products used in chemical value chains. The company also focuses on metals recycling, particularly electronic scrap and other secondary raw materials, and conducts ongoing exploration and project development within the Nordic region and Europe.

Projects Boliden is involved in

chemXplore tracks 6 projects involving Boliden, of which one is active.

Boliden's role on them: Owner, Investor / Financier, Operator, and Developer.

1 Announced / Concept

1 new construction.

What moved recently
  • 12 August 2026 Boliden Laver Copper-Gold Mine Development · Announced / Concept · Sweden

Targeting: Copper (1), Gold (1), Molybdenum (1), Silver (1)

Follow these projects in chemXplore →

Latest news on Boliden

27 August 2026
Boliden to acquire controlling stake in Nexa Resources from Votorantim

Deal uses a 0.25 share exchange valuing Nexa at ~USD 2.03bn equity (USD 3.67bn EV); closing targeted Q1 2027 with a VTO for remaining shares and USD 2.0bn bridge financing.

12 August 2026
Boliden: Laver concession upheld after appeals rejected

Government rejected appeals, keeping the Laver concession intact; the deposit could double Sweden’s copper output and boost Europe’s copper self-sufficiency by about 10%.

9 April 2026
Boliden: SEK 700m write-down at Garpenberg mine

March seismic activity damaged the upper Lappberget ore body and infrastructure (ventilation, compressed air, water, power, backfill) and some mobile equipment. Production halt cuts Q1 EBITDA ~SEK 400m

25 March 2026
Boliden: Seismic damage at Garpenberg cuts production to ~30%

Seismic activity eased; limited production restarts in Q2 at ~100 kt/month. Major damage in an ore body delays some mining into 2026. Q1 EBITDA impact -SEK400M; zinc grade slightly down.

18 March 2026
Boliden invests SEK 4bn in Garpenberg hoist and SEK 1.5bn in Rönnskär SCM plant

SEK 4bn hoist at Garpenberg to keep 4.5 Mt/yr past 2030; SEK 1.5bn Rönnskär demo plant (280 kt/yr SCMentum) 2026–28. SCM emits <5% of cement CO2; exploration continues.

18 March 2026
Boliden: Garpenberg mine production suspended after seismic activity

Garpenberg mine evacuated March 14 after heightened seismic activity; concentrator stopped March 15. Inspections began March 18; gradual restart pending inspections; timing and impact unknown.

16 March 2026
Garpenberg Mine Incident - Boliden

A rock fall at Garpenberg mine led to injuries and evacuation due to increased seismic activity. Production halted pending safety inspections.

4 March 2026
Boliden Kevitsa Initiates Change Talks Due to Finnish Mining Tax Increase

Finnish mining tax hike affects 285 jobs and halts a EUR 1 billion investment decision. Change talks to conclude in six weeks, impacting all 500 employees.

Where its projects are

By country, the most active first. active / all projects

Chemical parks and clusters