Graphite

projects tracked
13
active
11
producing plant
1

Also known as graphitic carbon and battery-grade graphite.

Graphite projects

chemXplore tracks 13 projects producing graphite, of which 11 are active.

  1. 5 projects Announced / Concept
  2. 3 projects FEED / Pre-FID
  3. none FID / Sanctioned
  4. 2 projects Under Construction
  5. 1 project Commissioning & Start-up

Of the active ones, 9 new construction and 2 expansion.

Expected start-up, by year
0 1 2 3 2026 2027 2028 2029 2030 2031

4 active projects carry no start-up date yet. The dates themselves, per project, are for subscribers.

What moved recently

  • 17 September 2026 EnergyPathways Hycamite hydrogen and graphite plant at Port of Barrow · Announced / Concept · United Kingdom
  • 19 May 2026 Nouveau Monde Graphite Matawinie Mine (Phase 2), Quebec · Under Construction · Canada
  • May 2026 Hycamite Kokkola battery-grade graphite expansion · Announced / Concept · Finland
  • May 2026 Hycamite Kokkola graphite - phase I · Announced / Concept · Finland

Latest news on graphite

29 September 2026
GEN‑H to build 200–300 MW zero‑emission balancing plant in Kotka using Hycamite methane pyrolysis

200–300 MW Kotka plant will make power from natural gas without CO2 by splitting methane into hydrogen and solid carbon for combustion and industrial use.

17 September 2026
EnergyPathways and Hycamite advance low‑carbon hydrogen and graphite plant at Port of Barrow

Plans target 20,000 t/yr hydrogen and ~60,000 t/yr graphite using methane decomposition; ties into MESH long‑duration storage to capture surplus wind power and cut emissions.

2 September 2026
Hycamite: Polaris confirms quality of natural gas-based battery graphite

Independent lab found methane-derived graphite matches commercial anode grades, with >350 mAh/g reversible capacity and target carbon footprint <2.5 kg CO2e/kg.

20 August 2026
Asahi Kasei develops lithium pre-doping method to boost silicon-rich LIB energy density

Electrolyte additives let low-cost lithium carbonate decompose at normal cell voltages, enabling pre-doping to cut first-cycle lithium loss and raise energy density (10% in a test cell).

29 July 2026
Eni second-quarter 2026 results and updated capital plan

Double-digit underlying production growth, new JV and project FIDs, entry into critical minerals, and a larger share buyback with slightly higher 2026 production guidance.

6 July 2026
CATL Tectrans II 8C superfast charging battery for light-duty commercial vehicles

Refueling-like 8C charging: 80% SOC in 6m48s, full in 8m56s; 10-year/1M km warranty; charges almost as fast at −20°C; 4,000 integrated stations planned across ~190 cities.

30 June 2026
Hycamite joins FutSteel to integrate hydrogen and carbon into steel production

Methane cracking to supply low‑carbon hydrogen and solid carbon for EAF-based steelmaking; three‑year research project starts June 2026 with university and industry partners.

23 June 2026
Hycamite updates leadership as Kokkola plant scales

Leadership roles shift while the Kokkola methane‑splitting plant expands to boost low‑carbon hydrogen and battery‑grade graphite output.

21 May 2026
Hycamite plans 200 kt/yr graphite plant in Finland

EU CRMA status and new tech enable a phased Finnish project: Phase 1 demo starts next year; full scale could reach 200 kt/yr (~40% of EU battery graphite demand), serving batteries and industry.

18 May 2026
NEUMAN & ESSER and Graforce unveil integrated low‑carbon hydrogen plant

Modular methane-to-hydrogen solution using plasma pyrolysis to produce hydrogen and solid carbon; up to 98% conversion, 10–15 kWh/kg H2; 20 MW (~2 t/h) available 2028.

Graphite plants by country

chemXplore tracks 1 plant producing graphite in 1 country.

plants

A subscription lists every plant we track for graphite, with its owners and capacity. What a subscription does →