Industriepark Höchst

Frankfurt-Höchst GermanyHessen

Projects at Industriepark Höchst

chemXplore tracks 27 projects at Industriepark Höchst, of which 4 are active.

3 Under Construction 1 Commissioning & Start-up

2 conversion / repurposing, 1 new construction, and 1 expansion.

Expected to start operating
2026
none
2027
none
2028
none
2029
none
2030
1 project
2031
none

1 of the active projects carry no start-up date yet.

What moved recently
  • December 2025 German Hydrogen Core Network (Wasserstoff-Kernnetz) · Commissioning & Start-up · Germany

Owners and developers: Gasunie Deutschland GmbH (2), Thyssengas GmbH (2), Celanese (1), Energinet (1), GASCADE Gastransport GmbH (1), Gasunie Energy Development GmbH (1)

Investors: KfW (1)

Contractors are recorded on 1 of these 4 projects For subscribers

Targeting: Hydrogen (2), Ethylene-vinyl acetate (1), Hydrogen chloride (1), Lithium chloride (1), Lithium hydroxide (1)

Follow these projects in chemXplore →

Latest news on Industriepark Höchst

3 December 2025
Vulcan Energy Secures €250M EIB Funding for German Lithium Project

EIB funds a lithium project in Germany, enhancing Europe's lithium supply chain, reducing imports, and supporting sustainable energy and transport initiatives.

1 August 2025
Vulcan's Lionheart: Zero-Carbon Lithium for Batteries

The project uses geothermal brine to produce lithium and renewable energy, reducing carbon footprint. It partners with Nobian for electrolysis expertise and aims to supply EV batteries in Europe.

10 July 2025
Nobian and Veolia Collaborate on Lithium Production

They aim to scale a new lithium conversion process, enhancing Europe's battery supply chain and sustainability, while seeking strategic partners for global expansion.

3 June 2025
INERATEC Launches Europe's Largest e-Fuel Plant in Frankfurt

ERA ONE produces 2,500 tonnes of carbon-neutral e-Fuels annually, aiding EU climate goals. It uses CO2 and hydrogen, with strong financial backing for scaling production.

3 June 2025
Clariant Catalyst Powers INERATEC's E-Fuels Plant in Frankfurt

The plant recycles 8,000 tons of CO₂ annually into 2,500 tons of synthetic fuels, using a catalyst that enhances efficiency and stability for sustainable fuel production.

5 March 2025
INERATEC secures €70 million for Europe's largest e-Fuel plant in Frankfurt

€70m funding will boost e-Fuel production, aiding aviation decarbonization and supporting EU climate goals through innovative reactor technology and strategic partnerships.

10 July 2024
BASF to Cease Glufosinate-Ammonium Production in Germany

Production will end by 2025 due to economic reasons. Jobs will be retained until then. The company will source from third-party suppliers and focus on next-gen solutions with lower application rates.

19 April 2023
INERATEC Breaks Ground on E-Fuel Plant in Frankfurt

Starting in 2024, the plant will produce 2,500 tons of e-fuels annually using CO2 and green hydrogen, contributing to climate goals and advancing sustainable mobility in aviation and shipping.

16 December 2022
New Hazardous Materials Facility Enhances Safety and Efficiency at Industriepark Höchst

A new warehouse at Industriepark Höchst offers advanced safety features, extensive digitalization, and temperature-controlled storage, enhancing logistics and meeting high demand in the Rhine-Main Region.

15 November 2022
First Hydrogen Train in World's Largest Fleet Unveiled in Frankfurt

The first hydrogen train for the Taunus system was presented, marking a step towards zero-emission mobility. The fleet will start operating in December, replacing diesel trains and reducing local emissions.

About the park

Total area
460 ha
Available area
50 ha

Companies at this park

Cluster Watch

Industriepark Höchst lies in the Frankfurt-Höchst cluster, one of the 16 chemical clusters of Northwest Europe. Cluster Watch maps what each is building and closing, and the pipelines between them.

Frankfurt-Höchst on the map →