Petrobras P-82 Platform Begins Voyage to Búzios Field

Key highlights
  • P-82 departed Tuas Boulevard Yard in Singapore on 18/10 headed for the Búzios pre-salt field.
  • The 80 series platforms have a nominal capacity of 225,000 barrels per day and to compress 12 million cubic metres of gas.
  • P-82 is 345.3 metres long, 60 metres wide, weighs more than 100,000 tonnes and is expected to start operating next year.
  • Petrobras plans US$109 billion of investment for 2026–30, with 75% allocated to Exploration & Production.

Voyage and platform specifications

The P-82 platform departed the Tuas Boulevard Yard shipyard in Singapore on 18/10 bound for the Búzios field in the pre-salt layer of the Santos Basin. It is the second 80-series unit to start its voyage in under a month, following the P-80, which left on 30/9. The unit measures 345.3 metres by 60 metres and weighs more than 100,000 tonnes. The 80 series has a nominal production capacity of 225 thousand barrels per day and capacity to compress 12 million cubic metres of gas.

Schedule and field outlook

P-82 is expected to start operating next year. The Búzios field is operated by Petrobras with partners CNOOC, CNPC and Pré-Sal Petróleo S.A. (PPSA). It is expected that 11 platforms will be operating at Búzios by the end of 2027.

Series construction and benefits

Building the 80-series in sequence aims to reduce costs, increase shipyard productivity, improve system reliability, lower project risk and speed field development. The units incorporate lessons learned from prior builds, advanced technologies and digital solutions to improve operational and energy efficiency. Petrobras is also using direct sailings with crews on board to enhance operational readiness.

Supply chain and contracting

Process modules for P-82 were manufactured in Brazil at Seatrium Aracruz and in Singapore and China, then transported to Singapore for final assembly. The platforms were contracted under an EPC model covering engineering, procurement, construction and commissioning. Petrobras has planned investments of US$109 billion for 2026–30, with 75% directed to Exploration & Production.

Source: Petrobras

chemXplore Weekly

The week’s project milestones and project news from the chemical industry, free every Wednesday.

Free. One email a week. Unsubscribe any time.

Related articles

30 September 2026
Petrobras P-80 (Búzios 9) Departs Singapore for Búzios Field

225,000 bbl/d oil capacity and 12 million m³/d gas processing; first of a six-platform series; P-80 and P-82 due to start production in 2027.

20 August 2026
Petrobras: FPSO Alexandre de Gusmão hits 180,000 bpd peak in Mero pre-salt

Planned for 12 wells (6 producers/6 injectors), currently 5 producers and 3 injectors are tied in; Mero averaged about 740 mbpd in Q2 2026; PRM monitoring and HISEP separation are being deployed.

3 March 2026
Petrobras Invests R$151 Million in Libra Rocks Geological Project

Libra Rocks aims to enhance oil recovery and reservoir management using AI and geological models, partnering with Brazilian universities for research and innovation.

4 December 2025
Shell Expands Stake in Brazil's Atapu and Mero Offshore Units

Shell increases its interest in Brazil's pre-salt oil projects, enhancing its production capacity and maintaining a focus on high-margin, low-carbon assets.

14 April 2026
Petrobras to invest $450M in world's largest seabed seismic monitoring project

Permanent seabed seismic sensor network in Mero (Santos Basin) will map reservoir behavior to improve recovery and monitor FPSO production. 460 km cables in place; first data Q2 2026; AI used.