Petrobras P-82 Platform Begins Voyage to Búzios Field

Key highlights
  • P-82 departed Tuas Boulevard Yard in Singapore on 18/10 headed for the Búzios pre-salt field.
  • The 80 series platforms have a nominal capacity of 225,000 barrels per day and to compress 12 million cubic metres of gas.
  • P-82 is 345.3 metres long, 60 metres wide, weighs more than 100,000 tonnes and is expected to start operating next year.
  • Petrobras plans US$109 billion of investment for 2026–30, with 75% allocated to Exploration & Production.
Related project For subscribers
Milestones, plant data, involved companies (owners, investors, licensors, contractors) and news — kept up to date.
Petrobras FPSO P-82 Newbuild for Búzios Field · Brazil
Commissioning & Start-up
2022-10
2022-10
2023-03-31
2026-08-27
Operational / Completed · expected date for subscribers

Voyage and platform specifications

The P-82 platform departed the Tuas Boulevard Yard shipyard in Singapore on 18/10 bound for the Búzios field in the pre-salt layer of the Santos Basin. It is the second 80-series unit to start its voyage in under a month, following the P-80, which left on 30/9. The unit measures 345.3 metres by 60 metres and weighs more than 100,000 tonnes. The 80 series has a nominal production capacity of 225 thousand barrels per day and capacity to compress 12 million cubic metres of gas.

Schedule and field outlook

P-82 is expected to start operating next year. The Búzios field is operated by Petrobras with partners CNOOC, CNPC and Pré-Sal Petróleo S.A. (PPSA). It is expected that 11 platforms will be operating at Búzios by the end of 2027.

Series construction and benefits

Building the 80-series in sequence aims to reduce costs, increase shipyard productivity, improve system reliability, lower project risk and speed field development. The units incorporate lessons learned from prior builds, advanced technologies and digital solutions to improve operational and energy efficiency. Petrobras is also using direct sailings with crews on board to enhance operational readiness.

Supply chain and contracting

Process modules for P-82 were manufactured in Brazil at Seatrium Aracruz and in Singapore and China, then transported to Singapore for final assembly. The platforms were contracted under an EPC model covering engineering, procurement, construction and commissioning. Petrobras has planned investments of US$109 billion for 2026–30, with 75% directed to Exploration & Production.

Source: Petrobras

chemXplore Weekly

The week’s project milestones and project news from the chemical industry, free every Wednesday.

Free. One email a week. Unsubscribe any time. See our Privacy Policy.

Related articles

3 November 2026
Petrobras P-78 (Búzios 6) Reaches 180,000 barrels per day

Hit nominal capacity; platform 180 km offshore; high permo-porosity, thick reservoir supports strong flows; Búzios will host 12 FPSOs with two due in 2027.

28 October 2026
Petrobras production hits record 3.512 MMboed in 3Q26

Operational efficiency, FPSO ramp-ups and fewer shutdown losses drove output growth, supported by 12 new wells and refinery and decarbonization advances.

27 August 2026
Petrobras and Seatrium baptize P-80 and P-82 at Tuas shipyard

Two pre-salt platforms bound for the Búzios field will sail to Brazil for 2027 start-up; each can produce 225,000 b/d and treat 12 million m³/d of gas.

6 August 2026
Petrobras posts R$52.4bn Q2 2026 profit

Quarterly results bolstered by record own oil output, above-100% refinery utilization and higher derivative production, supporting cash generation and lower imports.

29 June 2026
Búzios field tops 1.2 million barrels/day

Record reached after P-78 and P-79 began ramping up; field operates eight production units and plans 12 FPSOs.