ECLUSE Expands Steam Network Under Scheldt to Evonik

Key highlights
  • The Flemish Government granted 9.58 million euros for the ECLUSE 2 project.
  • ECLUSE 2 will connect to Evonik via a tunnel under the Scheldt.
  • The project aims to save at least 100,000 tons of CO2 emissions annually.
  • ECLUSE 2 supports the National Energy and Climate Plan goals for 2020-2030.
Related project For subscribers
Milestones, plant data, involved companies (owners, investors, licensors, contractors) and news — kept up to date.
ECLUSE Antwerp Scheldt microtunnel steam pipeline network · Belgium
Under Construction
2023
2024
—
2026

Project Overview

ECLUSE, a public-private steam network, plans to expand its operations to the right bank of the river Scheldt. The expansion, known as ECLUSE 2, involves transporting steam to Evonik through a tunnel under the Scheldt. The Flemish Government has allocated 9.58 million euros in subsidies for this energy-saving initiative.

Environmental Impact

The project aims to significantly reduce CO2 emissions by at least 100,000 tons annually, as Evonik will use less fossil fuel in its chemical processes. The steam provided is 50% biogenic, contributing to the production of 'green heat'.

Infrastructure Development

The construction of a tunnel under the Scheldt is essential for connecting the waste-to-energy site on the left bank with Evonik on the right bank. This connection will facilitate a sustainable industrial cluster and allow other companies to join in the future.

Contribution to Energy Goals

ECLUSE 2 will play a crucial role in meeting the National Energy and Climate Plan's objectives for 2020-2030. It is expected to contribute significantly to the growth of heat networks and green heat production targets.

Source: ECLUSE

chemXplore Weekly

The week’s project milestones and project news from the chemical industry, free every Wednesday.

Free. One email a week. Unsubscribe any time.

Related articles

14 October 2025
ECLUSE Completes Belgium's Longest Microtunnel

The ECLUSE tunnel under the Scheldt is complete, enabling steam transport from waste-to-energy facilities to Evonik, reducing CO₂ emissions and supporting Antwerp's energy transition.

5 June 2026
Röhm opens Bay City MMA plant as LiMA technology reaches full industrial scale

Proprietary LiMA process reaches full industrial scale; Bay City becomes North America’s first C2‑based MMA site with 250,000 tpa capacity and enhanced sustainability measures.

23 June 2026
Evonik builds Lülsdorf–Wesseling methanol pipeline to secure methionine feedstock

Shared regional storage and a new 4 km methanol pipeline improve feedstock security for methionine production while cutting Scope‑3 emissions and enabling future green methanol.

18 June 2026
Indaver opens Rivenhall IWMF, its largest Energy‑from‑Waste plant

Facility now processing waste and exporting power; capacity 595,000 t/yr and electricity for ~125,700 homes; €680m investment and plans for 40 ha low‑carbon greenhouses.

2 April 2026
Indaver and EcoWerf shift PMD transport to waterways

PMD collection now shipped by inland vessel: 10,000 t/year (replacing ~2,320 road trips), press reduces volume by two-thirds, cuts CO2 by ~127 t/yr; plan to move half waste to waterways.