BioBTX starts construction of PETRA circular aromatics plant

Key highlights
  • Plant will produce approximately 10,000 tons/year of renewable aromatic oil (benzene, toluene, xylenes) plus about 8,000 tons of sustainable by-products.
  • Construction on site starts early 2027 with plant start-up expected in mid-2028.
  • The in‑house ICCP process converts mixed plastic waste (and potentially biomass) to drop‑in BTX, targeting a 70–80% lifecycle GHG reduction in the first plant.
  • Project financing includes equity from Invest-NL, Infinity Recycling, Covestro, NOM and Carduso Capital, debt from Colesco Capital, FEAS and the Province of Groningen, and a DEI+ subsidy from RVO.
Related project For subscribers
Milestones, plant data, involved companies (owners, investors, licensors, contractors) and news — kept up to date.
FID / Sanctioned
2012
2022
2026-07-23
Under Construction · expected date for subscribers
Commissioning & Start-up · expected date for subscribers
Operational / Completed · expected date for subscribers

Project overview

BioBTX has taken a final investment decision for PETRA, the first commercial-scale plant to directly convert plastic waste into renewable aromatics using its ICCP technology. The decision completes a 14-year development path from the company’s founding in 2012 through lab and pilot demonstrations to commercial implementation.

Capacity and outputs

The plant is designed to produce roughly 10,000 tonnes per year of renewable aromatic oil (benzene, toluene and xylenes) and about 8,000 tonnes per year of sustainable by-products. The BTX products are presented as drop-in replacements for fossil-derived aromatics.

Technology and emissions

ICCP (Integrated Catalytic Cracking Process) integrates a thermal cracking step without oxygen followed by catalytic upgrading of released gases to BTX. Separating the steps improves reaction control, catalyst life and enables processing of mixed or contaminated waste streams. The first plant is expected to achieve a 70–80% lifecycle greenhouse‑gas reduction, with potential for higher, carbon‑negative savings in future deployments.

Timeline, site and deployment

Permits, engineering and financing are in place, main suppliers and contractors selected, and process module manufacturing has started. On‑site construction starts early 2027 at Chemie Park Delfzijl, with start-up expected mid‑2028. The facility will create around 35 jobs phased in over the coming year and serve as a commercial demonstration to enable larger and diversified installations, including possible biomass feedstocks.

Financing and partners

Equity investors include Invest-NL, Infinity Recycling, Covestro, NOM and Carduso Capital; debt financing is provided by Colesco Capital, FEAS and the Province of Groningen, supplemented by a DEI+ subsidy from RVO.

Source: BioBTX

chemXplore Weekly

The week’s project milestones and project news from the chemical industry, free every Wednesday.

Free. One email a week. Unsubscribe any time.

Related articles

24 September 2026
BioBTX and Rain Carbon to supply renewable aromatics

Convert plastic waste into about 10,000 t/y of renewable aromatic oil and downstream benzene, phthalic anhydride and aromatics for circular supply chains; first plant operational early 2028.

13 August 2026
BioBTX (Covestro-backed) to produce BTX aromatics from mixed plastic waste

First commercial ICCP plant in Delfzijl will process 20,000 t/yr mixed plastic into ~10,000 t/y BTX aromatic oil and ~8,000 t/y by-products, cutting GHG 70–80%.

1 April 2026
BlueAlp chosen as tech partner for BioBTX circular-aromatics plant

Licensed pyrolysis modules will convert hard-to-recycle plastics into circular BTX aromatics. Plant capacity ~20 kta; modules built now, shipping to site from Dec 2026.

9 January 2026
Zeopore and BioBTX Boost Circular Aromatics Yield from Waste Plastics

A new catalyst and pyrolysis process doubles BTX yields from waste plastics and biomass, enhancing sustainable chemical recycling.

9 September 2026
BASF installs Durasorb LNG MAX at Cheniere’s Corpus Christi facility

Single‑unit adsorbent solution commissioned to simplify pre‑treatment, prevent freeze‑out and increase feed‑gas flexibility; full rollout planned by end‑2027.