26 April 2024
INEOS Oligomers Opens Solar Farm for CO2-Free Power at Feluy Site
The solar farm spans 2 hectares, generates 3.8 MW, and cuts 800 tonnes of CO2 annually, aiding the site's goal of carbon-neutral PAO production by 2030. A larger farm is planned for 2026.