EC 215-138-9
Also known as quicklime and burnt lime.
Mid double-digit million-euro package covers pulp fiberline, recovery boiler, white liquor gasifier and handling equipment; start-up targeted mid‑2027.
Pre-engineering covers preheating/cooling layout and multi-stage cyclone preheater with cyclone-flash cooling. Material tests validate thermal behavior for electrified, low-emission quicklime pilot.
Developing a pilot plant for electric arc calcination to boost lime production efficiency, reduce emissions, and enhance Nordic industry resilience.
The project neutralizes emissions, protects water, and restores ecosystems, using efficient treatment to transform acidic tars into inert waste, ensuring compliance with environmental standards.
The project uses SaltX tech for CO2-free lime production, with a 2027 completion target and 40,000-ton capacity, backed by EUR 24M from Enova.
chemXplore tracks 2 plants producing calcium oxide in 2 countries.
plants
A subscription lists every plant we track for calcium oxide, with its owners and capacity. What a subscription does →