Its roles EPC Technology / equipment supplier
Valmet is a Finland-based global developer and supplier of process technologies, automation systems, and services for the pulp, paper, and energy sectors. The company designs and delivers production lines and equipment, plant-wide control and digital solutions, and provides maintenance and performance services through an international service network.
For the chemical and biochemicals value chain, Valmet supplies technologies and turnkey solutions for biomass conversion and biorefining, including pretreatment, hydrolysis, lignin handling, evaporation and recovery, gasification, and combined heat and power. Following the integration of flow-control operations, it also provides valves and related automation for demanding process applications across chemicals, refining, and energy. Valmet works with producers and project developers on greenfield plants, capacity upgrades, and process optimization, with capabilities spanning engineering, equipment supply, commissioning, and lifecycle support.
chemXplore tracks 8 projects involving Valmet, of which 4 are active.
Besides these 4, the record holds 3 completed projects and 1 on hold.
4 more active projects and the 4 that are completed, on hold or cancelled are in the record. See all 8 in chemXplore →
Long-term H2PPAs secure physical renewable power and Guarantees of Origin for RFNBO-compliant hydrogen, enabling flexible e‑methane production and advancing the project's FID.
Integrated technology chain will turn renewable electricity and captured biogenic CO2 into e‑methane, using electrolysis, methanation, hydrogen handling and waste-heat recovery to district heating.
E‑methane and green hydrogen projects in Finland to receive EIB support; Tampere site targeted to start construction in Q4 2026.
Mid double-digit million-euro package covers pulp fiberline, recovery boiler, white liquor gasifier and handling equipment; start-up targeted mid‑2027.
Acquires peristaltic hose and progressive cavity pump tech plus aftermarket parts and services; products to be rebranded and production moved to Lappeenranta; closing Oct 1, 2026.
A €25m Muoto fibre-packaging line will be built at the Äänekoski mill, starting up in 2028 with capacity above 100 million items per year; Kuura textile fibre project cancelled.
Preferred‑supplier agreement secures electrolyzer technology for green hydrogen and e‑methane projects, reinforcing Tampere deployment and pipeline scale‑up.
Long-term €1bn offtake secures Tampere-produced e‑methane for heavy-duty transport via existing gas/LNG infrastructure across Europe.