Its role EPC
Strukton Groep B.V. is a prominent Dutch construction and engineering company focused on sustainable infrastructure development. Headquartered in Utrecht, it specializes in civil engineering, rail infrastructure, road construction, bridges and viaducts, water management, and industrial projects.
The company designs, builds, and maintains infrastructure using innovative and circular solutions, including emission-free construction methods, recycled materials, and advanced technologies for durability and reduced environmental impact. It operates through subsidiaries such as Strukton Civiel Nederland, Strukton Rail Nederland, and Strukton Infra Specials, providing integrated services across multiple disciplines.
Strukton maintains a strong presence in the Netherlands and has operations in five home countries including Italy, Belgium, Sweden, and Denmark. It serves both public sector clients and private industrial partners, contributing to major projects in energy transition, transportation, and industrial facilities.
With roots dating back to 1921, Strukton has grown into a key player in the European infrastructure sector, emphasizing safety, quality, and sustainability. In the SkyNRG Delfzijl DSL-01 project, it serves as the civil and structural construction partner responsible for site preparation, foundations, and building works under the EPC contractor Technip Energies.
Also known as Strukton Groep and Strukton Civiel Nederland B.V..
chemXplore tracks 1 project involving Strukton, of which one is active.
1 more active project is in the record. See all 1 in chemXplore →
Will leave the CEO role on 31 December 2026 and support handover through Q1 2027; Board has appointed Egon Zehnder to run the external CEO search.
Europe’s first purpose-built SAF plant will convert residual fats into ~100,000 t/yr drop-in jet fuel, targeting start-up in 2028 to support EU SAF mandates.
Construction begins on DSL-01. First commercial-scale SAF plant to secure non‑recourse financing; aims for ~100,000 t/yr by 2028 via HEFA from low‑quality feedstocks, >100 jobs and €16M JTF support.
100,000 t/yr SAF plus 35,000 t/yr sustainable by‑products; CO₂ savings up to 80%; construction started and operation expected mid‑2028.
The plant will produce 100,000 tonnes of SAF annually, cutting GHG emissions by up to 90%. KLM is the main off-taker. Construction follows a seven-year development phase. Completion is due in 2028.
Technip Energies will handle EPCC for Europe's first standalone SAF facility in the Netherlands, producing 100,000 tons annually using HEFA technology.
The plant will produce 100,000 tonnes of SAF annually, cutting GHG emissions by up to 90%. KLM is the main off-taker. Construction starts after securing non-recourse project financing.
Agreements on emission values led to design changes, reducing wastewater discharge and enhancing sustainability without court involvement.
active all projects
What each is building and closing, and the pipelines and grids between them, on one map.