Neuman & Esser Group

Germanyneuman-esser.de

Neuman & Esser Group (NEA Group), founded in 1830 as a family-owned business in Übach-Palenberg, Germany, is a global manufacturer of reciprocating and diaphragm compressors, grinding and classifying systems, and integrated solutions for industrial applications.

The company serves sectors including oil and gas, chemicals, petrochemicals, food, energy, and renewables. With over 190 years of expertise, particularly in hydrogen compression, NEA provides advanced hydrogen value chain technologies such as PEM electrolyzers (NEA|HYTRON), steam reformers, hydrogen refueling stations, and compressor systems. It operates production sites in Germany and the USA, with around 1,900 employees worldwide.

NEA supports the energy transition and circular economy, supplying equipment like electrolyser modules for green hydrogen projects in the chemical and refining industries.

Projects NEA Group is involved in

chemXplore tracks 4 projects involving NEA Group, of which 4 are active.

NEA Group's role on them: Technology / equipment supplier.

1 Announced / Concept 3 Under Construction

3 new construction and 1 conversion / repurposing.

Expected to start operating
2026
none
2027
none
2028
3 projects
2029
none
2030
none
2031
none

1 of the active projects carry no start-up date yet.

What moved recently
  • 18 May 2026 NEA-Graforce Modular Low-Carbon Hydrogen Plant Solution · Announced / Concept

Contractors, licensors, and offtakers are recorded on all 4 of them For subscribers

Targeting: Hydrogen (4), Carbon (1), HVO (1), Liquefied Petroleum Gas (LPG) (1), Methane (1), Naphtha (petroleum), catalytic reformed (1)

Follow these projects in chemXplore →

Latest news on NEA Group

29 September 2026
OMV Petrom advances Strategy 2030 execution

Half of €11bn capex deployed; Neptun Deep first gas H1 2027; renewables, storage, SAF/HVO unit and expanded EV charging to 2030.

21 September 2026
OMV Petrom advances EUR 560m SAF/HVO unit at Petrobrazi

EUR 560m unit to produce 250,000 t/yr SAF and renewable diesel from vegetable fats and used cooking oils; commissioning targeted for 2028.

21 September 2026
EWE awards Bilfinger contract for Huntorf hydrogen treatment

Engineering, installation and commissioning of an H2 drying system for a 16 million Nm³ repurposed salt cavern; Bilfinger’s H2Dry debuts commercially; operations targeted 2028.

28 August 2026
OMV Petrom raises Petrobrazi green hydrogen capacity to 55 MW with second 35 MW electrolyzer

Second 35 MW electrolyzer fully delivered, lifting Petrobrazi’s green H2 capacity to 55 MW to supply refining and a 250,000 t/y SAF/HVO unit.

31 July 2026
OMV Petrom Group H1 2026 results

Clean CCS Operating Result 3 bn lei; net income 1.8 bn lei; CAPEX 3.7 bn lei; contribution to state budget 10.2 bn lei; Neptun Deep on track for first gas in 2027.

25 June 2026
OMV Petrom: all modules delivered for 20 MW Petrobrazi electrolyzer

Final module delivered for the 20 MW electrolyzer; it will produce ~3,000 t/yr green hydrogen for the SAF/HVO unit; total planned capacity is 55 MW across two projects.

22 May 2026
PRC Europe 2026: Downstream leaders focus on decarbonisation in Amsterdam

Delegates debated turning ambitions into bankable projects: hydrogen integration, SAF, refinery synergies, circular feedstocks, recycling tech, digitalisation and execution risk

18 May 2026
NEUMAN & ESSER and Graforce unveil integrated low‑carbon hydrogen plant

Modular methane-to-hydrogen solution using plasma pyrolysis to produce hydrogen and solid carbon; up to 98% conversion, 10–15 kWh/kg H2; 20 MW (~2 t/h) available 2028.

Where its projects are

By country, the most active first. active / all projects