Owner Investor / Financier Operator Developer Offtaker Pre-FEED / FEL study
Also known as Metsä Fibre, Metsä Tissue, Metsä Board, Metsä Wood, and Metsä Forest.
chemXplore tracks 6 projects involving Metsä, of which 2 are active.
Besides these 2, the record holds 4 completed projects.
Closest to start-up first.
The 4 that are completed, on hold or cancelled are in the record. See all 6 in chemXplore →
Planned Rauma plant would capture 100,000 tCO2/yr from pulp‑mill flue gas for use in e‑fuels; funding clears a key investment hurdle.
A €25m Muoto fibre-packaging line will be built at the Äänekoski mill, starting up in 2028 with capacity above 100 million items per year; Kuura textile fibre project cancelled.
The partnership will deploy Qutwo OS to optimise wood procurement and tissue converting lines, aiming to raise wood value and lower variable costs between forest and mill.
€370m rebuild doubles capacity to ~145,000 t/yr; new production line and three converting lines; improved energy efficiency, lower water use and emissions.
Pre-engineering for a wood-based textile fibre mill aims for industrial production by 2029, with a focus on low climate impact and high added value.
The €1.6B investment will create 1,500 jobs, boost exports by €0.5B annually, and enhance sustainability. The mill will produce 1.5M tonnes of pulp and 2.0 TWh of renewable electricity per year.
The mill, operational since August 2017, produces 1.3 million tonnes of pulp annually, plus bioproducts like tall oil, turpentine, and bioenergy. It also explores new bioproducts and industrial ecosystem expansion.
The Äänekoski mill's board machine rebuild boosts capacity by 30,000 t to 240,000 tpy. The project, part of a larger investment, also increased production at Simpele and Kyro mills by 120,000 tpy.