Its role EPCI
chemXplore tracks 2 projects involving Allseas, of which one is active.
Besides this one, the record holds 1 completed project.
1 more active project and the 1 that is completed, on hold or cancelled are in the record. See all 2 in chemXplore →
Stage 2 began production on 22 August, accelerating 55 billion scm from Troll West, coming online early and several hundred million NOK below the original cost estimate.
Five connected CCS projects (Porthos, Aramis, CO₂next, DRC, DSC) will capture, transport and store CO₂ under the North Sea and link industry across the Netherlands, Belgium and Germany.
Tender opened for 200 km CO2 pipeline, linking Maasvlakte to offshore storage, aiding decarbonization. Further tenders for installation and design to follow. Operational by 2030.
A 20-km CO2 pipeline is laid and entrenched under the North Sea, connecting Rotterdam's port to storage reservoirs over 3 km below the seabed.
D-HUBN is an offshore platform for CO2 distribution, using hybrid energy. It coordinates CO2 transport to storage sites, focusing on safety and efficient operations.
The new unit will use Cryocap™ technology to capture CO₂ from a hydrogen plant, transport it via Porthos, and store it in North Sea gas fields, reducing emissions by 2.5 million tons annually.
Porthos will invest €1.3 billion in a CO2 transport and storage system in Rotterdam, operational by 2026. It will store 2.5 Mton CO2 annually for 15 years, aiding Dutch climate goals.
active all projects
What each is building and closing, and the pipelines and grids between them, on one map.