The Netherlandsgateterminal.com
Its roles Owner Investor / Financier Operator
Also known as Gate LNG Terminal.
chemXplore tracks 2 projects involving Gate Terminal, of which one is active.
Besides this one, the record holds 1 completed project.
Closest to start-up first.
The 1 that is completed, on hold or cancelled are in the record. See all 2 in chemXplore
Proportional EBITDA guidance lifted to EUR 1,200–1,220m and proportional operating free cash flow to ~EUR 840m after YTD proportional OCF of EUR 671m (EUR 5.88/share) and robust project contributions.
New 180,000 m³ tank adds 4 bcm/y regasification, raising terminal capacity to 20 bcm/y and strengthening supply security for the Netherlands and NW Europe.
Assessing conversion of Turkish waste-based biogas plants to biomethane for export to the EU via existing gas grids.
Opened a 32‑km Rotterdam hydrogen pipeline, progressed CO₂ and heat projects, boosted LNG capacity, and saw shifting gas flows with higher power‑sector demand.
active all projects