Plug launches GenEco Scale electrolyzer plant system for Arcadia’s 280 MW Project ARC

Key highlights
  • Arcadia eFuels is the first customer for the 280 MW hydrogen plant planned for Project ARC in Texas.
  • Plug has completed the technical evaluation and front-end engineering design study for Project ARC.
  • GenEco Scale uses standardized 20 MW blocks for projects of approximately 100 MW and above.
  • Project ARC is designed to produce about 23.2 million gallons of e-SAF annually using renewable hydrogen.
Related project For subscribers
Milestones, plant data, involved companies (owners, investors, licensors, contractors) and news — kept up to date.
Arcadia eFuels Project ARC e-SAF Plant, Texas · United States
FEED / Pre-FID
2024-08
2024-08
—
—
—
Operational / Completed · expected date for subscribers

Integrated electrolyzer plant offering

Plug has launched GenEco Scale, an integrated plant offering based on its proton exchange membrane (PEM) electrolyzer technology. It combines standardized, outdoor-ready 20 MW blocks with balance-of-plant systems in a pre-engineered modular design for projects of approximately 100 MW and above. Plug says the design reduces EPC engineering and integration work and targets a footprint of less than one acre per 100 MW of electrolyzer capacity.

Project ARC

Arcadia eFuels is the first customer, selecting GenEco Scale for a planned 280 MW hydrogen plant at Project ARC in Texas. Plug has completed the technical evaluation and front-end engineering design study. The project is designed to produce approximately 23.2 million gallons of electro-sustainable aviation fuel annually using renewable hydrogen. The companies also have a previously announced 280 MW electrolyzer supply agreement for Project ENDOR in Denmark.

Design and deployment

The offering uses a standardized reference-plant design and factory-built, factory-tested modules. Its balance-of-plant layout arranges process skids and cooling equipment across multiple levels. Plug says the approach is intended to reduce requirements for buildings, land and infrastructure, simplify installation and commissioning, and limit on-site hydrogen inventory. Plug serves as the single responsible OEM for the integrated electrolyzer process plant.

GenEco Scale is commercially available for utility-scale hydrogen projects. Plug says it has shipped more than 320 MW of PEM electrolyzer capacity worldwide.

Source: Plug Power

chemXplore Weekly

The week’s project milestones and project news from the chemical industry, free every Wednesday.

Free. One email a week. Unsubscribe any time. See our Privacy Policy.

Related articles

9 November 2026
Plug Power reports $201m Q3 revenue and 65-point gross-margin improvement

Quarterly net cash use fell 54% sequentially to $28m, while operating expenses dropped 69% year on year.

15 October 2026
Plug Power reports Q3 2026 progress and schedules Nov. earnings call and symposium

Q3 revenue rose >10% y/y and company remains on track for ~15–16% full‑year growth; Q3 net cash usage ≈ $28M with ≈ $134M cash on hand; margin improvement and an ~$8bn electrolyzer pipeline.

29 September 2026
Plug Power and Arcadia eFuels partner for >1 GW e‑SAF electrolyzer supply; 280 MW for Denmark ENDOR

Preferred electrolyzer supplier for over 1 GW of e‑SAF projects; initial 280 MW GenEco will produce ~110 t/day renewable H2 for jet fuel at Port of Vordingborg; ENDOR moving to FID.

23 September 2026
Uniper and Arcadia eFuels agree 40,000 t/y eSAF offtake for Project Endor

40,000 t/yr eSAF commitment for 10+ years from Project Endor in Denmark; deliveries planned from early 2030s; fuel claims up to 98% lifecycle emissions reduction and EU compliance.

9 June 2026
European eSAF Coalition — Arcadia eFuels, INERATEC, Norsk e‑Fuel, SkyNRG, ZAFFRA

Five companies urge EU, national governments and NATO to prioritise electro‑SAF for Europe’s energy security, industrial competitiveness and defence readiness.