FEED EPC Investor / Financier EPCM PMC / Owner's engineer Pre-FEED / FEL study
Worley is a global engineering and professional services company serving the energy, chemicals, and resources industries. Formerly known as WorleyParsons, the company supports customers across the full asset lifecycle, from concept and advisory through project delivery and operations.
Its capabilities span consulting and feasibility studies; front-end and detailed engineering; procurement; construction and construction management; fabrication; commissioning; operations, maintenance, and turnarounds; brownfield modifications; and decommissioning. Worley’s work covers refining and petrochemicals, polymers, fertilizers, gas processing and LNG, as well as emerging areas such as hydrogen, carbon capture and storage, and low‑carbon power.
Operating through regional entities and specialized units—including Worley Rosenberg and Worley Consulting—the company executes projects and provides support for onshore, offshore, and subsea assets for customers worldwide.
Also known as WorleyParsons, Worley Canada Construction, Worley Canada, Worley Consulting, Worley Rosenberg and 7 more.
chemXplore tracks 33 projects involving Worley, of which 31 are active.
Besides these 31, the record holds 1 project on hold and 1 cancelled.
Closest to start-up first.
30 more active projects and the 2 that are completed, on hold or cancelled are in the record. See all 33 in chemXplore →
9 active projects carry no start-up date yet. The dates themselves, per project, are for subscribers.
H1: revenues €4.7m, EBITDA -€18.8m, cash €23.9m; first FDCA batch produced; planned equity raise ≥€55m and proposed €20m facility; Worley contractual close‑out finalised.
First FDCA batch produced at Delfzijl; product qualification begins with aim for commercial sales by end of 2026.
Five‑year framework covers EPC across UK Continental Shelf assets including Scott, Buzzard and Golden Eagle; scope ranges from like‑for‑like replacements to complex brownfield works and decommissioning.
FEED covered two offshore packages including ~150 km subsea, gas export and CCS pipelines; project targets ~9.5 Mtpa LNG and supports Indonesia's energy security and net-zero 2060 goals.
Strategic advisory study identifies 24 capex-reduction levers and delivers a transparent, executive-ready capex model to guide decisions and improve commercial viability of renewable hydrogen.
Engineering for a modular demo plant using plasma conversion of CO2 and biomethane to produce 200 t/yr renewable syngas for lower‑carbon fuels, plastics and chemicals.
Contracts cover study and EPCM work for potential Olympic Dam block cave and Carrapateena underground expansion; both projects are subject to BHP final investment decisions.
Medium-to-heavy sweet crude from Tilenga and Kingfisher, up to 230,000 b/d, will ship via the EACOP to the Port of Tanga; a US$2bn facility and Tanga regional hub are planned.
active all projects
The 8 with the most active projects, of 13 countries.
What each is building and closing, and the pipelines and grids between them, on one map.