Its roles FEED EPCI
Samsung Heavy Industries Co., Ltd. (Korean: 삼성중공업 주식회사) is a major South Korean shipbuilding and offshore engineering company. It designs and constructs large commercial vessels and energy infrastructure, including liquefied natural gas (LNG) and liquefied petroleum gas (LPG) carriers, crude and product tankers, ultra-large containerships, floating LNG (FLNG) units, floating production, storage and offloading (FPSO) vessels, and fixed or semi-submersible offshore platforms.
For the chemical and energy sectors, the company delivers assets that enable extraction, processing, liquefaction, storage, and marine transport of hydrocarbons and petrochemical feedstocks. Its capabilities include engineering, procurement, construction, and integration of topside process modules and cryogenic containment systems, supporting global LNG and LPG value chains and related petrochemical logistics.
chemXplore tracks 2 projects involving Samsung Heavy Industries, of which 2 are active.
2 more active projects are in the record. See all 2 in chemXplore
Order intake €12.7bn raised backlog to €25bn; H1 revenue €3.7bn and EBITDA €212m after provisions; Project Delivery margin guidance reduced for 2026.
2 mtpa FOB for up to 20 years with first deliveries from 2032; hydro-powered liquefaction targeting ~90% lower carbon intensity; co-developed with the Nisga’a Nation.
LOI outlines a 2 mtpa long-term LNG purchase, with first volumes possible in 2032 from a proposed 12 mtpa BC floating export facility designed for low emissions.
Coral Norte FLNG will produce ~3.6 Mtpa, doubling the Coral hub to 7 Mtpa and placing Mozambique among Africa’s top three LNG producers.
Coral Norte, Mozambique's second FLNG, progresses with proven design, enhancing efficiency and LNG capacity, following Coral Sul's success.
Coral North FLNG hull launched in South Korea, doubling Mozambique's LNG output by 2028, enhancing efficiency, and boosting local economy and job creation.
The Coral North FLNG project in Mozambique aims to boost LNG production to over 7MTPA by 2028, enhancing economic growth and job creation.
active all projects