Its role Offtaker
Kazakh Gas Processing Plant LLP (also known as KazGPZ LLP or KazGPP) is a limited liability company based in Zhanaozen, Mangystau Region, Kazakhstan. It has operated the local gas processing plant since its commissioning in 1973, handling associated petroleum gas and natural gas from nearby oil fields.
The company processes raw gas into commercial dry gas, liquefied petroleum gas (LPG), pentane-hexane fraction, and other products, serving as a primary supplier of LPG and fuel gas to the Mangystau region and supporting local industrial and household needs. It receives feedstock from producers including Ozenmunaigas JSC, Mangistaumunaigas JSC, Tenge Oil & Gas LLP, and Tasbulat Oil Corporation LLP.
As a wholly owned subsidiary within the JSC NC KazMunayGas (KMG) group, the national oil and gas champion of Kazakhstan, KazGPZ forms part of the country's vertically integrated energy sector. KMG holds the company through its structure, ensuring alignment with national energy strategies focused on gas utilization, environmental compliance, and operational reliability.
The firm is actively developing a new gas processing plant in Zhanaozen with an annual capacity of 900 million cubic meters to replace the aging facility (over 90% worn). This project, with approximately 167.6 billion tenge in investment, involves EPC contracts and modular construction, aiming to boost safety, efficiency, and output of marketable gas, LPG, and fractions while sustaining oil production in the region. The company maintains strong emphasis on industrial safety, ecology, and workforce development as a key player in Kazakhstan's gas processing industry.
Also known as KazGPZ LLP, ТОО «КазГПЗ», and KazGPP.
chemXplore tracks 1 project involving KazGPZ, of which one is active.
1 more active project is in our database. See all 1 in chemXplore
A 77 MW wind facility is the next phase, with commercial operations planned for 2027.
Revenue +23.7% to 5,568 bln tenge; EBITDA +45% to 1,655 bln; net profit +69.1% to 904 bln; net debt rose to 983 bln tenge as cash/deposits declined.
First industrial electricity from the 120 MW gas unit at the 247 MW Mangystau hybrid plant; integrates solar, gas and planned wind to decarbonize regional supply.
The 50 MW solar plant in Kazakhstan is part of a 247 MW hybrid project, integrating solar, wind, and gas to support energy transition and local economic growth.
active all projects