Bolton to build sustainable adhesives plant in Rheinmünster, Germany

Key highlights
  • Bolton Adhesives will move into a new plant at Rheinmünster Chemical Park, operational by end-2027.
  • Construction of the production facilities is scheduled to start soon on the site that has hosted the UHU logistics centre since 2018.
  • The site will centralize production and logistics to shorten time-to-market and improve supply-chain efficiency.
  • Planned measures include higher automation, site electrification and alternative transport routes to reduce CO2 emissions.

Location and schedule

Bolton Adhesives will relocate to a plant at Rheinmünster Chemical Park; construction starts soon and operations are planned by end‑2027; the site has hosted the UHU logistics centre since 2018.

Operations and logistics

The facility will centralize production and logistics to shorten time‑to‑market and improve supply‑chain efficiency through integrated processes and higher automation.

Sustainability and infrastructure

Plans include energy‑efficient design, site electrification and alternative transport routes intended to reduce CO2 emissions.