Vallourec S. A.

Francevallourec.com/en

Its role Technology / equipment supplier

project tracked
1
news articles
7

Vallourec S. A. is a France-based global manufacturer specializing in seamless steel tubes and tubular solutions for energy and industrial markets. The company designs and produces critical piping for demanding operating conditions worldwide.

Read more

Its product portfolio covers OCTG (casing and tubing), line pipe, and mechanical and structural tubes, engineered for high-pressure, high-temperature, and corrosive environments. Vallourec serves upstream oil and gas, refineries, petrochemical and chemical processing, and power generation, as well as emerging applications such as hydrogen, CO2 transport and storage (CCUS), and geothermal. Capabilities include alloy and corrosion‑resistant grades, heat treatment, inspection, and proprietary threaded connections to support reliable installation and operation.

Also known as Vallourec Group.

Projects Vallourec is involved in

chemXplore tracks 1 project involving Vallourec, of which one is active.

  1. none Announced / Concept
  2. none FEED / Pre-FID
  3. none FID / Sanctioned
  4. 1 project Under Construction
  5. none Commissioning & Start-up

1 more active project is in the record. See all 1 in chemXplore →

Vallourec in chemical industry news

25 August 2026
Equinor reshapes international portfolio — targets 950,000 boepd outside Norway by 2030

Portfolio concentrated into fewer countries, expected ~USD 20bn free cash flow 2026–2030; US, Brazil and Angola to drive growth; higher margins from high-grading and stepped-up exploration.

30 July 2026
TechnipFMC Q2 2026 results

Revenue $2.76bn; net income $363m; Subsea inbound $2.5bn; cash from operations $548m and free cash flow $488m; $440m returned to shareholders.

29 July 2026
Eni second-quarter 2026 results and updated capital plan

Double-digit underlying production growth, new JV and project FIDs, entry into critical minerals, and a larger share buyback with slightly higher 2026 production guidance.

9 July 2026
Salzgitter AG to acquire 100% of Hüttenwerke Krupp Mannesmann (HKM)

Acquire Duisburg steelworks, convert site to electric-arc furnace, cut workforce from ~3,000 to ~1,000 and aim for ~90% CO2 reduction.

22 June 2026
Saipem wins $1bn offshore T&I contract from Azule Energy for Greater PAJ, Angola

40-month T&I package for an ultra-deepwater field: ~180 km rigid pipelines, 38 km flexible flowlines, 54 km umbilicals; fabrication at Ambriz yard; water depth up to 2,000 m.

22 June 2026
Eni FID for Greater PAJ — Angola's first cross-block offshore development

Final Investment Decision for Greater PAJ, Angola’s first integrated cross‑block offshore development; FPSO 95,000 b/d, gas export 70 mscfd, first oil H1 2029.

6 February 2026
Salzgitter AG to Become Sole Shareholder of HKM from June 2026

Agreement reached for share transfer; slab supply to thyssenkrupp Steel secured until 2028. Approval from governing bodies and Vallourec S.A. required.

Where its projects are

active all projects

  • Angola 1 active project, 1 in all