Conversion to 100% biomass (wood chips) will cut ~100,000 t coal and ~200,000 t CO2 annually; NFOŚiGW grant 99.9 mln PLN; commissioning planned H2 2028.
Pre-FEED for an Iisalmi biorefinery converting forestry residues and renewable hydrogen into ~180,000 t/y bio‑e‑methanol; operations targeted by 2030 and future SAF output.
The project will cut coal use by 100,000 tonnes annually, reduce CO2 by 200,000 tonnes, and includes a biomass fuel system, aiming for zero coal by 2033. Completion is expected in 2027.
The new biomass boiler will cut CO₂ emissions by over 30%, using recycled wood chips. It will reduce fossil fuel use by a fourth and aligns with the company's greenhouse gas reduction goals.