Its role Technology / equipment supplier
Piller Blowers & Compressors GmbH is a German engineering company that designs and produces blowers and compressors for industrial use. Specializing in high-performance centrifugal machines, the firm provides solutions for gas compression in chemical processing, petrochemical plants, and energy applications.
The company is particularly noted for its VapoFlex compressor systems, which are employed in heat pump installations to generate steam from waste heat sources. These systems are critical for projects aiming at energy efficiency and decarbonization in large industrial sites.
Headquartered in Germany, Piller serves customers across Europe and beyond, often acting as a subcontractor to major engineering firms in the chemical sector. Its equipment is selected for reliability in continuous operation environments such as steam crackers and related facilities.
In the context of the chemical industry, Piller positions itself as a niche supplier of specialized rotating equipment, contributing to the modernization of production plants through advanced compression technology. The company maintains a focus on innovation in vapor handling and compression to meet the demands of sustainable industrial processes.
With a history in blower and compressor manufacturing, Piller has established expertise in multi-stage compressor designs suitable for varying pressure requirements. Its involvement in projects like the BASF Ludwigshafen heat pump initiative highlights its capability to deliver large-scale equipment packages on schedule for major clients.
chemXplore tracks 1 project involving Piller, of which one is active.
1 more active project is in the record. See all 1 in chemXplore
Heat pump under construction will use waste heat and renewable electricity to generate ~500,000 t/yr CO₂‑free steam (50 MW), cutting ~100,000 t CO₂/yr for formic acid production; commissioning mid‑2027.
The project will cut 100,000 tons of CO2 annually, using renewable energy for steam production, with completion set for mid-2027.
The heat pump will cut emissions by 100,000 tons annually, using waste heat and renewable energy, with commissioning set for 2027. The project receives up to €310 million in government funding.
active all projects
What each is building and closing, and the pipelines and grids between them, on one map.