Karassay Machine-Building Plant is an industrial manufacturer focused on producing and servicing machinery and engineered components for heavy industry. Capabilities include metal fabrication, precision machining, and assembly of equipment and parts used in process plants and related infrastructure.
The company serves sectors such as oil and gas, petrochemicals, power, and general manufacturing, supplying build-to-spec components, refurbishment, and spare-part production to support safe and reliable plant operations. Its activities contribute to industrial supply chains by providing durable equipment and workshop services for project execution and maintenance.
In 2025, $10.6B was paid to Kazakhstan. Crude oil output rose by 12M tons. Air emissions cut by 78% since 2000. 71% local content achieved. Social programs benefited 10,000 in Atyrau.
In 2025, $10.6B paid to Kazakhstan, crude oil output rose, emissions cut by 78%, 71% local content achieved, and social programs benefited 10,000 in Atyrau.