JGC Holdings Corporation

Japanjgc.com

FEED EPC EPCI Technology / equipment supplier

projects tracked
7
active
7
countries
7
news articles
23

JGC Holdings Corporation, operating as the JGC Group, is a leading Japanese engineering and construction company specializing in large-scale industrial projects. Headquartered in Yokohama, Japan, it functions as a pure holding company overseeing subsidiaries engaged in engineering, procurement, and construction (EPC) services as well as functional materials manufacturing.

Read more

The core EPC business involves the planning, design, procurement, and construction of plants and facilities across energy transition, oil and gas production, refining, petrochemicals, LNG, gas processing, infrastructure, healthcare, and circular economy sectors. The group has executed more than 20,000 projects in over 80 countries, establishing a strong global presence with particular expertise in LNG facilities, where it holds over 30% market share in production capacity. Subsidiaries such as JGC Corporation handle overseas operations while JGC Japan manages domestic projects.

In the functional materials segment, companies like JGC Catalysts and Chemicals manufacture and sell catalysts for petroleum refining and petrochemical processes, along with fine chemicals, electronic materials, and environmental products. Japan Fine Ceramics produces advanced ceramics for electronics. The group is publicly traded on the Tokyo Stock Exchange Prime Market (code 1963) and forms part of the TOPIX 100 and Nikkei 225 indices.

Established in 1928, the company transitioned to its current holding structure in 2019. It plays a significant role in the chemical and petrochemical industries through both plant construction and catalyst supply, while expanding into sustainable technologies including hydrogen, renewables, and resource recycling to support global decarbonization efforts.

Also known as 日揮ホールディングス株式会社, JGC Corporation, Japan Gasoline Co., Ltd., 日揮株式会社, and JGC.

Projects JGC Holdings is involved in

chemXplore tracks 7 projects involving JGC Holdings, of which 7 are active.

  1. none Announced / Concept
  2. 2 projects FEED / Pre-FID
  3. 1 project FID / Sanctioned
  4. 4 projects Under Construction
  5. none Commissioning & Start-up

7 more active projects are in the record. See all 7 in chemXplore →

Expected start-up, by year
0 1 2 2026 2027 2028 2029 2030 2031

2 active projects carry no start-up date yet. The dates themselves, per project, are for subscribers.

JGC Holdings in chemical industry news

19 October 2026
Técnicas Reunidas wins EPCM contract for Coastal GasLink Phase 2

EPCM award for Coastal GasLink Phase 2 covers detailed engineering, procurement and construction management for five compressor stations in BC; contract >€200m with 4+ year execution.

29 September 2026
JGC-Fluor JV receives NTP for LNG Canada Phase 2 after FID

Notice to Proceed issued for LNG Canada Phase 2 after FID; contract mainly lump-sum with some cost-plus; JGC to recognise US$7.5bn in fiscal 2026 after FEED update.

29 September 2026
Fluor JV with JGC Selected for LNG Canada Phase 2 After FID

Notice to proceed issued; US$7.5bn share to be recognized in Q3 FY2026; Phase 2 adds one storage tank and two trains, doubling output to ~28 Mtpa.

29 September 2026
Shell approves final investment decision for LNG Canada Phase 2

Phase 2 will double Kitimat LNG output to 28 mtpa; Shell’s 40% stake adds nearly 6 mtpa, with commercial operations targeted in the early 2030s.

28 September 2026
TotalEnergies strategy and outlook 2026

4% annual energy growth to 2030; $10bn free cash flow uplift 2025–2030; $14–17bn/yr capex 2027–2032; dividend +5%/yr to 2030 and planned buybacks.

17 September 2026
JGC to co-establish SEA METEC, Southeast Asia's first methane evaluation centre

Four-way MoC creates a regional centre for testing, verification, training, R&D and knowledge sharing on methane measurement technologies in Southeast Asia.

15 September 2026
PETRONAS-led SEA METEC collaboration with JOGMEC, JGC and TotalEnergies

New Southeast Asia centre to evaluate methane measurement and monitoring technologies, deliver training, and align reporting with OGMP 2.0 Level 4/5.

7 September 2026
TotalEnergies advances Papua LNG toward FID

EPC tendering completed, capex trimmed to ~$14bn after ~$4bn savings; operatorship to move to ExxonMobil; LNG marketing JV and offtake deals secure 2.4 Mtpa and 1.5 Mtpa.

Where its projects are

active all projects