JGC Fluor BC LNG II JV

Canadajfjvkitimat.com

Its role EPC

project tracked
1
news articles
6

JGC Fluor BC LNG II JV is a Canadian joint venture company formed specifically to deliver engineering, procurement, fabrication, construction, and commissioning services for the Phase 2 expansion of the LNG Canada liquefied natural gas export facility located in Kitimat, British Columbia.

Read more

The entity is owned on a 50/50 basis by Fluor Canada Ltd. and JGC Constructors (No2) BC Ltd., subsidiaries of the major international engineering and construction firms Fluor Corporation and JGC Corporation, respectively. It builds directly on the same partners' successful execution of Phase 1 of the project, which involved two liquefaction trains and supporting infrastructure that began producing LNG in 2025.

For Phase 2, the JV is responsible for adding two new liquefaction trains, an additional LNG storage tank, expanded processing and utility systems, condensate storage, an extra loading berth, and enhanced shipping capabilities. This work will double the overall facility capacity to approximately 28 million tonnes per annum.

Operating from its primary base in Kitimat, the JV focuses on large-scale energy infrastructure in the LNG sector. It supports Canada's position as a supplier of lower-carbon natural gas to global markets under a 40-year export licence. The structure reflects a collaborative model between leading EPC contractors for complex, multibillion-dollar energy projects.

Also known as JFJV2, JGC Fluor Joint Venture, and JGC Fluor BC LNG II.

Projects JGC Fluor BC LNG II JV is involved in

chemXplore tracks 1 project involving JGC Fluor BC LNG II JV, of which one is active.

  1. none Announced / Concept
  2. none FEED / Pre-FID
  3. none FID / Sanctioned
  4. 1 project Under Construction
  5. none Commissioning & Start-up

1 more active project is in the record. See all 1 in chemXplore →

What its projects make

JGC Fluor BC LNG II JV in chemical industry news

6 November 2026
Fluor Q3 2026: record $10.9B awards and $34.3B backlog

Revenue rose 10% to $3.7B; GAAP EPS $1.16 and adjusted EPS $0.77. Q3 buybacks $300M; affirms 2026 adjusted EBITDA guidance of $500–$525M.

19 October 2026
Técnicas Reunidas wins EPCM contract for Coastal GasLink Phase 2

EPCM award for Coastal GasLink Phase 2 covers detailed engineering, procurement and construction management for five compressor stations in BC; contract >€200m with 4+ year execution.

29 September 2026
JGC-Fluor JV receives NTP for LNG Canada Phase 2 after FID

Notice to Proceed issued for LNG Canada Phase 2 after FID; contract mainly lump-sum with some cost-plus; JGC to recognise US$7.5bn in fiscal 2026 after FEED update.

29 September 2026
Fluor JV with JGC Selected for LNG Canada Phase 2 After FID

Notice to proceed issued; US$7.5bn share to be recognized in Q3 FY2026; Phase 2 adds one storage tank and two trains, doubling output to ~28 Mtpa.

29 September 2026
Shell approves final investment decision for LNG Canada Phase 2

Phase 2 will double Kitimat LNG output to 28 mtpa; Shell’s 40% stake adds nearly 6 mtpa, with commercial operations targeted in the early 2030s.

1 June 2026
Fluor‑JGC JV Wins LNTP for LNG Canada Phase 2 Expansion

Limited notice to proceed issued to begin early planning and key activities for the proposed Phase 2 expansion at the LNG Canada Kitimat export facility, supporting an FID that would double 14 Mtpa.