FSRU Wilhelmshaven GmbH is a German limited liability company (GmbH) based in Wilhelmshaven, Lower Saxony. It was established in 2023 as a joint venture between Tree Energy Solutions (TES) and ENGIE to develop and construct marine infrastructure for the Wilhelmshaven 2 LNG import terminal project.
The company's core activities encompass the planning, permitting, construction, rental, and operation of FSRU landing infrastructure, including a purpose-built island jetty in the Jade waterway, subsea pipelines, gas transfer systems, and related facilities. It has secured key approvals under Germany's LNG Acceleration Act (LNG-Beschleunigungsgesetz) and managed contractors for jetty building and dredging works on behalf of Deutsche Energy Terminal GmbH (DET).
Operating exclusively in Germany within the energy infrastructure sector, FSRU Wilhelmshaven GmbH enables LNG regasification and grid integration for floating storage and regasification units (FSRUs), supporting national energy security following the 2022 supply disruptions. The entity focuses on project delivery for the Wilhelmshaven 2 terminal, which connects to the Open Grid Europe network.
As a project-specific JV, it reflects collaboration between TES, focused on energy transition solutions, and ENGIE, a leading international energy group. The company has obtained permits for operations including wastewater discharge and emissions control associated with FSRU activities at the site.
Also known as VERONIKA Siebenunddreißigste Vermögensverwaltungsgesellschaft mbH and FSRU Wilhelmshaven.
chemXplore tracks 1 project involving FSRU Wilhelmshaven GmbH.
FSRU Wilhelmshaven GmbH's role on them: Developer.
By country, the most active first. active / all projects