FEED EPC EPCI PMC / Owner's engineer Pre-FEED / FEL study
Fluor Corporation (Fluor) is a U.S.-based, publicly traded engineering, procurement and construction (EPC) company headquartered in Irving, Texas. Founded in 1912, the company delivers complex capital projects for clients worldwide across energy, chemicals, infrastructure, mining and metals, government and industrial markets.
For the chemical industry, Fluor provides end-to-end services spanning studies and front-end engineering design (FEED) through EPC, commissioning, start-up, and operations and maintenance. Its portfolio includes petrochemical and polymer units, downstream refining and aromatics, fertilizers, specialty chemicals, and emerging low‑carbon and circular chemistry projects such as hydrogen, carbon capture and bio-based fuels. Fluor utilizes global engineering centers, supply chain management, modularization and fabrication capabilities to execute large-scale, multi-unit sites and debottlenecking, as well as brownfield revamps and turnarounds.
Also known as Fluor Corporation.
chemXplore tracks 25 projects involving Fluor, of which 14 are active.
Besides these 14, the record holds 8 completed projects, 2 on hold and 1 cancelled.
14 more active projects and the 11 that are completed, on hold or cancelled are in the record. See all 25 in chemXplore →
2 active projects carry no start-up date yet. The dates themselves, per project, are for subscribers.
MoU to assess local renewable hydrogen supply for a planned Delfzijl biomethanol plant, targeting roughly 12,000 tonnes H2 per year to boost biomethanol yields.
Notice to Proceed issued for LNG Canada Phase 2 after FID; contract mainly lump-sum with some cost-plus; JGC to recognise US$7.5bn in fiscal 2026 after FEED update.
Notice to proceed issued; US$7.5bn share to be recognized in Q3 FY2026; Phase 2 adds one storage tank and two trains, doubling output to ~28 Mtpa.
Phase 2 will double Kitimat LNG output to 28 mtpa; Shell’s 40% stake adds nearly 6 mtpa, with commercial operations targeted in the early 2030s.
Appointment advances DeltaTorr/DeltaNor toward FID for a biomethanol plant converting biogenic residual streams, with up to €1 billion capital at stake.
Low‑grade waste wood will be routed to Dutch biomethanol and biomethane plants to secure feedstock for scalable production.
Revenue rose 9% to $4.3B; new awards $6.1B and backlog $26.9B; adjusted EBITDA guidance narrowed and reduced; $300M returned to shareholders in Q2.
Q2 results: revenue PLN 76.5bn, LIFO EBITDA PLN 13.9bn, net profit PLN 7.7bn; record foreign retail profits and H1 capital expenditure PLN 14.7bn.
active all projects
The 8 with the most active projects, of 13 countries.
What each is building and closing, and the pipelines and grids between them, on one map.